Before you dig

Call 811 before digging a fence in Ohio and Pennsylvania

Planning · Updated October 2026

Woven wire fence line in morning snow

Before any post hole is dug, the person doing the digging has to notify the state 811 service so buried utility lines get marked at no cost. Ohio and Pennsylvania use different notice windows, and Ohio changed its numbers in 2026. Confirm the current rule on your state's 811 site before you schedule anything.

Who has to call, and why a fence counts

The excavator makes the call, and for a fence the excavator is whoever puts an auger, shovel or post driver in the ground. A fence is a long line of holes, and any one of them can hit a gas line, a water service or a buried cable. OHIO811 says to contact it whenever soil is disturbed, and it names tree planting, landscaping, fences, mailboxes and pool leveling as examples. Hand digging counts too.

The notice costs nothing. OHIO811 describes the notice as quick, at no cost and required by law, and PA One Call says its service costs nothing for homeowners digging on their own residential property.

  • If you dig the holes yourself, you place the request.
  • If you hire a fence contractor, the contractor performing the work places it. In Ohio, OHIO811 advises homeowners to confirm that it was done. In Pennsylvania, ask for the contractor's 11-digit PA One Call serial number as proof.
  • In Pennsylvania, a homeowner should not call on a hired excavator's behalf.

On our jobs, the 811 request is handled as part of the job. Solid Rock Fencing builds fence and gate work in Ohio and Pennsylvania, and the crew places the notice for the dig. Whoever you hire, ask about the 811 notice before the first post, the same way you would ask about the gate swing. The estimate process is a good time to raise it.

The Ohio rules

Ohio's OHIO811, also called the Ohio Utilities Protection Service, asks for notice at least 2 working days before digging, not counting the day you call. Weekends and legal holidays are not working days. The notice also cannot be placed too early, because it may be made no more than 16 calendar days before digging. The definitions of excavator and working day sit in ORC 3781.25.

Ohio ruleWhat it saysWhy it matters
Earliest you can callNo more than 16 calendar days before diggingCalling a month ahead does not help
Latest you can callAt least 2 working days before digging, not counting the day of the callWeekends and legal holidays do not count
How long a ticket lasts16 calendar days from submissionStart late and you need a new notice
Markings destroyedStop and notify again for re-markingRain, mowing and traffic wear paint off

These numbers come from House Bill 227, which replaced the older figures of 48 hours and 10 working days. OHIO811's own summary lists June 9, 2026 as the effective date. We read that date on OHIO811's summary and did not confirm it in the enacted statute text, so check oups.org for the current rule before you plan around it.

The Pennsylvania rules

Pennsylvania's PA One Call, reached by dialing 811, requires notice not less than 3 business days and not more than 10 business days before excavation starts. The wording on the PA One Call excavator page is "not less than 3 business days nor more than 10 business days prior to commencing excavation work." A Public Utility Commission legal brief citing 73 P.S. 180(2.1) confirms the window, and the PUC tells homeowners and contractors to call at least three business days before any digging.

  • Minimum notice is 3 business days, and the maximum is 10 business days.
  • Complex projects need the full 10 business days and go through Coordinate PA.
  • PA One Call can be reached by dialing 811, by calling 800-242-1776, or by filing a request online.
  • Homeowners are asked to mark the proposed dig area in white, using chalk, paint or stakes, unless they give exact site information.
  • On an active site, the ticket does not have to be refreshed every 10 business days as long as the markings are preserved and equipment has not been off the site for more than 2 business days.

A timeline for a fence job

The notice period is a fixed part of the schedule, so plan around it. Weekends and legal holidays matter in Ohio, and a Friday call behaves very differently from a Monday call. As an example, count a Friday call in Ohio this way. Saturday and Sunday are not working days, Monday and Tuesday are the two working days, and the earliest dig day is Wednesday. Confirm the date on your own ticket, because holidays shift the count.

StageOhioPennsylvania
Place the noticeCall 811 or file online, at least 2 working days ahead, not counting the call dayCall 811, 800-242-1776, or file online, at least 3 business days ahead
Earliest to call before diggingNo more than 16 calendar daysNo more than 10 business days
Marking windowUtility owners send locators during the notice periodFacility owners mark within 18 inches horizontally of the line's outside edge
Ticket life16 calendar days from submissionNot confirmed by the pages we read, use the dates on the ticket
Marks destroyedStop and notify againDo not guess, wait for fresh marks
Long jobNew notice if digging has not started by day 16No refresh needed if marks are kept and equipment is not off site more than 2 business days

Marks are close, not exact

The paint tells you where to be careful, not exactly where the line is. PA One Call has facility owners mark within 18 inches horizontally of the outside edge of a line, and its guidance says prudent techniques such as hand digging are required inside that zone. A Pennsylvania Public Utility Commission brochure says marks can be off by 18 to 24 inches. A fence line that runs parallel to a marked utility deserves a hand-dug test hole before the auger comes out. We found no equivalent number on the OHIO811 pages we read, so we give none for Ohio.

Private lines are not marked

Some service lines on private property belong to the owner, and 811 locators may not mark them. OHIO811 says a private locator may be needed. A line to a detached barn, a yard light, a well pump or a pool is the usual example. Tell the crew about anything you buried yourself, and show them where the trench ran. If you do not remember, say so. A private locator is a better answer than a guess.

What to do after the lines are marked

  1. Walk the lineLook at the paint and flags along the planned route. Note anything that crosses the line or runs beside it.
  2. Talk through the layoutTell the crew about the marks, the gates and any private lines. Small shifts in post spacing or a gate location are easier on paper.
  3. Leave the marks aloneDo not rake, mow or paint over them. Keep vehicles and animals off flagged areas where you can.
  4. Check the ticket on dig dayConfirm the ticket is still valid on the day digging starts.
  5. Dig carefully near marksUse hand digging close to marked lines. If the paint is destroyed before work is done, stop and notify again.
  6. Report any damage at onceIf a line is hit or damaged, stop work and tell the utility owner. Do not cover it up.

Get your FREE estimate

Tell us what you are fencing and where. We will talk it through with you and come out to walk the line.

Questions we hear

Does the 811 call cost anything?

No. OHIO811 describes the notice as quick, at no cost and required by law. PA One Call says its service costs nothing for homeowners digging on their own residential property. Whoever is digging, you or a contractor, still has to place the notice before any post hole is started.

How many days before digging do I call in Ohio?

Ohio's 2026 rule is at least 2 working days before digging, not counting the day you call, and no more than 16 calendar days ahead. Weekends and legal holidays are not working days. Check oups.org for the current rule before you schedule.

How many days before digging do I call in Pennsylvania?

Pennsylvania requires notice not less than 3 business days and not more than 10 business days before excavation begins. Dial 811 or use PA One Call's online request. Complex projects need 10 business days. Confirm on the PA One Call site before you schedule.

Does my fence contractor call 811 or do I?

The person doing the digging calls. If a contractor digs, the contractor submits the notice. In Pennsylvania, ask for their 11-digit PA One Call serial number. In Ohio, OHIO811 advises homeowners to confirm the contractor made the call. On our jobs, the request is part of the work.

Will 811 mark the lines I buried myself?

Not always. Some service lines on private property are the owner's responsibility, and OHIO811 says a private locator may be needed to find them. Tell your fence crew about any lines to a barn, well, pool or yard light, and where the trench ran.

What do I do if the paint marks get wiped out?

In Ohio, the excavator must stop and notify OHIO811 again so the lines are re-marked. Do not guess where a line ran. Wait for fresh marks, and tell the crew right away if rain, mowing or traffic has worn the paint.

Sources (11)